Support of School and Concept For education, the most important is the place where children and students can come to learn and study. Better place makes them better education. Way of DEFC Support So far the DEFC has worked for construction of 9 buildings. These are 4 elementary school, 3 secondary school, and 2 dormitory buildings. |
|
1. Contract (MOU) and Supervision Xiengkhuang Education Office Feb. 2005 Place Nathong Village、Khun District Syengkhuang Province Reasons of DEFC Support Luck of school rooms to increasing students, and one of
the UXO places. Donor Budget The donor gave 7.000US$ for one floor 5 rooms
building. Trans-over Sept. 2005
A Snap at the trans-over ceremony in front
of the new building Sept. 2005 |
Start of Construction Mar. 2005The New Building Sept.2005 Results by having a new school building Students come to school increased. |
2. Contract (MOU) and Supervision Phongxaly Education Office Jan. 2006 Place Mongchau Village、Phongxaly District, Phongxaly Province Reasons of DEFC Support Not good education conditions, luck of school
rooms to increasing students. Donor Budget The support money was 13.000US$ for one
floor 3 rooms building. Trans-over Jan. 2007 The New Building Jan.2007
A Far View of the Results by having a new school building Places students living, Jan.2007 |
Some School Buildings at A Reported Picture showing Students in front
of their new The New Building Jan.2007 Trans-Over Ceremony, Jan.2007, The Donor is going to give her speech.
Places students to eat and sleep, Jan.2007 |
3. Contract (MOU) and Supervision Keoudon District Education Office, 2006,
July. Reasons of DEFC Support A monk’s eagerness, who wanted to re-open
a secondary school at his temple after a
serious UXO accident at his former school
place. Monck students would come to his school
from whole country. They should have good
study ability but economically very poor.
Donor Budget The support money was 10.000 (final 13,000)
Trans-over Oct. 2007
Trans-over Ceremony, Oct. 2007 |
The Second Money Payment, Dec. 2006On the Way of Construction, Mar. 2007 A Snap of the Trans-over Ceremony, Oct. 2007 Results by having a new school building They had started new semester after trans-over. But a Japanese group visited
there at Jan. 2008, there were no students. |
4. Student Dormitory of Contract (MOU) and Supervision Nambhak District Education Office, 2007,
July. Reasons of DEFC Support Increasing student number makes a lot of small grass roof and bamboo hut around school. The village and school be expected expand. Donor Budget The support money was 14,000US$ for one floor
3 rooms dormitory having two bed floors. One room is for boy, another for girl (each 40 students)
and for dormitory teachers. The Construction Work DEFC money was used mainly to buy materials
for the building, and students, student family
and villagers worked for construction. Trans-over Jan. 2008
The
Villagers working for New Dormitory, Sept. 2007 Inside of the room, Jan. 2008 |
Student Hut-Dormitories made with Grass and Bamboo
Inside and Student’s Properties, July 2007 Their New Dormitory having Cooking House Students welcoming Guests to their New Home Inside of the room, Jan. 2008 Results by having a new dormitory
|
5. Student Dormitory of Contract (MOU) and Supervision Phongxaly Education Office, Sept. 2008 Place Mongchau Village、Phongxaly District, Phongxaly Province Reasons of DEFC Support Increasing student number makes a lot of small grass-
bamboo hut around the school. Their living
conditions are very serious. Donor Budget The support money was 15,000US$ for one floor dormitory having two bed floors, where 80 students can stay and sleep. (Another same size dormitory was made at the same time by the Provincial Government.)
Inside of Student Hut, Jan. 2008
|
Student Village of Grass-Bamboo Hut
Wall having Air Exchange Mouth, 2009 Jan.
Inside of the Dormitory having two Bed Floors, Jan. 2009Snap at the Trans-over Ceremony, Jan. 2009 |
6. Contract (MOU) and Supervision Nambak District Education Office, May 2008 Reasons of DEFC Support Increasing student Number by the people moving from mountain. The village and school be expected expand.
Donor Budget The support money was 15,000US$ for one building
having three class rooms and one toilet having
2 rooms. The money donated by SIVIO (Student
International Volunteer Individual Organization
in The Construction Work DEFC money was used mainly to buy materials
for the building, and student family and
villagers worked for construction. Trans-over Sept. 2008
The
Their New
Donor Students and the School Students in
Front of their New
Revisit to see the School and Children, Aug. 2009 |
SIVIO Delegation meeting with Villagers May 2008
MOU Signing, May 2008 Morning of Trans-over Ceremony, Sept.2008 Villagers Welcoming the Donors, Sept. 2008
Planting for their Memory, Sept. 2008
Results by having a new |
7. Contract (MOU) and Supervision Oudomxay Education Office, July 2008 Reasons of DEFC Support Increasing Student Number. People of thee villages around the
school have been expecting a new school building.
Donor Budget The support money was 50,000US$ for one building
having 5 class rooms, one teacher room and
one separate toilet having 2 rooms. The money
donated by an international organization
LIONS (5R1Z). Trans-over February 2009
MOU Signing and First Pay June 2008 A Snap over-lapping old and new school building on the construction, Sept. 2008Memorial Sign Board of the |
School Buildings Mar. 2008 Students playing at their play ground
Teacher’s Room
Their
|
8 and 9. Contract (MOU) and Supervision Oudomxay Education Office, Feb. 2009 Reasons of DEFC Support Luck of class rooms for increasing
student number. The school place, named Sibounheuang Area is recommended by
Government for moving from mountain. The villagers moved to send their
children to school. Donor Budget The support money was total 50,000US$ for two buildings (one is elementary, and another secondary school), each having 3 class rooms and one teacher room. The money donated by a Japanese couple.
Two School
Buildings under Construction, May 2009 The Donor Couple meeting with the Students, May 2009 Memorial Sign Boards to A Snap at the Trans-over Ceremony, May 2009, the construction was not finished, yet, though. Two New Buildings at A New Class Room, Sept. 2009
|
One of the class rooms at the School MOU Signing and the First Payment, Feb. 2009
A close snap of Two School Buildings under Construction, May 2009
The Donor Couple with the Education Staff, May 2009 A Snap at the Trans-over Ceremony, May 2009
A Memory of Donor Couple and Students, May 2009
Students in their New Class Room, Sept 2009.
end |
Support of School and 10. Contract (MOU) and Supervision Nambak District Education Office, Sep. 2009 Reasons of DEFC Support Lack of better school building. Donor Budget The support money was 5,000US$ for one building
having two class rooms and one toilet having
2 rooms. The money donated by Tsubomi Group
in The Construction Labor Donor money was used mainly to buy materials
for the building, and student family and
villagers worked for construction. Hand-over Feb. 6, 2010 |
|
Support of School and 11. Contract (MOU) and Supervision Nambak District Education Office, May 18.
2009 Reasons of DEFC Support Increasing number of students by the people
moving from mountainous places. Donor Budget The support money was 10,000US$ for one building
having three class rooms, one toilet of 2
rooms, and teacher’s room. The money donated
by SIVIO (Student International Volunteer
Individual Organization in The Construction Labor The SIVIO money was used mainly to buy materials
for the building, and student family and
villagers worked for construction. Hand-over Feb. 23. 2010 |
Three rooms of right hand side are SIVIO 1’st, and the left three rooms are SIVIO 2’nd school building. |